Hamburg: Difference between revisions

From LibreMC Earth Wiki
No edit summary
No edit summary
Line 1: Line 1:
[[Category:Towns]]
[[Category:Towns]]
{{Town
|title = Hamburg  <!-- The name of the town -->
|mayor = [[Br3add]]  <!-- The current or last mayor of the town -->
|date = 29th March 2025 <!-- The date that this town was created -->
|image = Hamburg_Flag.png  <!-- The file that should be used as the flag. Preferably use the banner that the town officially used -->
}}
Hamburg is a town located in northern Germany at the location of the IRL [[wikipedia:Hamburg|Hamburg]]. It was created by [[Br3add]] It is currently a part of the [[Germany|German nation]]. It currently has a population of 3.
Hamburg is a town located in northern Germany at the location of the IRL [[wikipedia:Hamburg|Hamburg]]. It was created by [[Br3add]] It is currently a part of the [[Germany|German nation]]. It currently has a population of 3.



Revision as of 20:14, 24 August 2025


Hamburg
Mayor Br3add
Established 29th March 2025

Hamburg is a town located in northern Germany at the location of the IRL Hamburg. It was created by Br3add It is currently a part of the German nation. It currently has a population of 3.

History

Its first iteration was created on June 8th, 2025 by Br3add. Around this time, the construction of the Hamburg city hall was started. Br3add soon went inactive and the town fell on June 12th due to lack of funds.

Br3add then recreated Hamburg on June 14th, 2025. The Hamburg city hall was soon completed and construction on the south side of the Elbe River started with a grey building, designed to house a mega smelter. The upper floors were designed to house future citizens. A sandstone building was soon built next to it to house a sugarcane farm.

More buildings were built around this time, all of which, are residences. Residents DunkerDweller and I_likeMondays also registered and joined Hamburg around this time in mid July. DunkerDweller in particular made the Dunker Tower, which is the sand tower to the west of the main portion of town. Also around this time, the underground farm was constructed to meet the agricultural needs of the city.

Hamburg was briefly the capital of the Northern Coalition before it was renamed into Germany and the capital was transferred back to Munich. On July 23rd, 2025, the stadium started construction in western Hamburg, with its first layer being completed around that time.

Hamburg was largely inactive during late July before regaining activity in August. Around this time, the villager trading hall and the wool store was also constructed. Construction on the stadium also resumed during August, however, it has yet to be completed.